Customer must have an existing electric account. |
| ~ |
Call 639-2823, 639-2824, or 639-2826 to schedule a time for an engineer to look at the site. |
Area Lights
| 1. |
You will be required to sign an area lighting contract--three years for overhead and five years for underground. After the contract is signed and the light is installed, the rental fees will be added to your next bill. A cost of 40% of the balance will be charged if the light is no longer wanted before the contract expires. |
2. Lights can only be mounted on City electric poles.
3. Costs:
a. |
Area light/month-–$18.74 (150w only) to $26.57 (for pole and underground) |
b. |
400w flood light/month--$33.15 |
c. |
1000w flood light/month--$44.60 |
4. Types of light:
a. |
150w high pressure sodium-- $18.74 |
b. |
400w metal halide flood--$33.15 |
c. |
1000w metal halide flood--$44.60 |
5. Associated charges:
a. |
Underground--$4.90 or a one-time payment of $246.51/pole |
b. |
Wood pole--$2.93 |
c. |
Special pole--$6.94 |
CLICK HERE for a printable Area Light Contract that can be filled in and mailed back. This file opens with Acrobat Reader. If you do not have Reader, click link below to download a free copy.

Other Electric Services
1. Request for underground or overhead residential service
| a. |
Open account at Customer Service Office. |
| b. |
Contact Electric Engineering Office for site visit. Will need address and lot number plus name and phone number. |
| c. |
Allow 8-10 working days for work to be completed. |
2. Request for underground or overhead commercial service
| a. |
Open account at Customer Service Office. |
| b. |
Contact Electric Engineering Office for site visit. Will need address and lot number plus name and phone number. |
| c. |
Allow 8-10 working days for work to be completed.
|
3. Request for overhead to underground service conversion
| a. |
Contact Electric Engineering to set up site meeting. |
| b. |
Cost: $385--can be reduced by $192.50 if serviced size is increased. |
Cost per linear foot is $2.40. Normal cost to customer is between $500
and $700 for the City’s part of the work.